Home
About
About UsService Areas
Complete Restoration
Condo RestorationCondo Suite RenovationCommon-Area RefurbishmentFor Property Managers
Balcony & Exterior
Balcony RestorationBalcony WaterproofingBalcony Railing ReplacementCondo Exterior RestorationParking Garage Restoration
Emergency & Damage
24/7 Emergency ResponseWater Damage RestorationSewage Backup & Flood CleanupFire & Smoke DamageMold Removal & TestingStorm Damage RepairLeak Detection
Hazards & Air Quality
Asbestos Testing & AbatementBiohazard & Trauma CleanupOdour Removal & Air Filtration
Claims
Insurance Claims SupportResource HubContact Us
Contractor Onboarding Documents Condo Property Managers Should Request by CondoWorks in Toronto and the GTA
Home/Resource Hub/Contractor Onboarding Documents Condo Property Managers Should Request

Contractor Onboarding Documents Condo Property Managers Should Request

WSIB clearance, liability insurance, licences, safety plan, references, schedule and emergency contacts: a checklist for the onboarding file.

Condo contractor onboarding documents are the paperwork a property manager collects before a contractor starts work in the building: a current WSIB clearance, a certificate of liability insurance that names the corporation, proof of licences for regulated trades, a site safety plan, references, a work schedule with an access plan, and emergency contacts. Collecting them up front protects the corporation, makes a loss or a project easier to run, and gives the board a clean file if anyone asks questions later. This guide lists each document, what to check on it and how to keep the file current. It is general information and does not set legal minimums.

Key takeaways

  • A practical onboarding file has seven parts: WSIB clearance, liability insurance, trade licences, a safety plan, references, a schedule and access plan, and emergency contacts.
  • A document is only useful if it is checked: the name, dates, limits and wording matter as much as having the paper.
  • Set requirements through the corporation's insurer, lawyer and contractor rules. This guide does not state legal minimums for insurance limits or safety obligations.
  • Track expiry dates. WSIB clearances and insurance certificates expire, so the file needs a reminder system, not a one-time check.

Which onboarding documents should a condo property manager request?

A good onboarding package answers four questions before the first worker arrives. Is this contractor registered and in good standing? Is the corporation protected if something goes wrong? Is the work being done safely and by qualified people? And does everyone know the schedule, the access rules and who to call? The documents below answer those questions in order. They apply to a one-day repair and to a multi-month program, although the depth of review should match the size and risk of the work.

For managers who handle several buildings, the same package can become a standard template. That is the idea behind our restoration for property managers service model: contractor rules, certificate requirements and emergency contacts are shared once, so that a loss at 2 a.m. does not start with a paperwork scramble. The table below summarizes the full set.

DocumentWhat it showsWhat to checkWhen to collect it
WSIB clearanceThe contractor is registered with the WSIB and up to date on premiums and reportingBusiness name matches the contract, the clearance is current and covers the work periodBefore work starts, and again when it expires during a long project
Certificate of liability insuranceThe contractor carries commercial general liability coverageNamed insured, policy dates, limits your insurer accepts, the corporation shown as additional insured, description of operationsBefore work starts, and at each policy renewal
Trade licences and registrationsRegulated work is being done by authorized contractorsLicence is current and held by the company or the individual doing the workBefore the relevant trade starts
Site safety plan and training recordsThe contractor has planned for the hazards of this job and trained its workersThe plan fits this building: access, falls, fire watch, dust, noise, shared areasBefore work starts, with updates if the scope changes
References and experienceThe contractor has done similar work in occupied buildingsReferences are recent, relevant and reachableDuring selection, before award
Work schedule and access planWhen, where and how the work will happenHours match the building rules, elevator and loading dock bookings are included, residents are notifiedBefore mobilization
Emergency contactsWho can be reached at any hourNames, mobile numbers and a backup, for both the contractor and the buildingAt onboarding, reviewed each time something changes

Use the table as a checklist and adapt it to your corporation's rules. Where the corporation has a policy or a contractor rules document, that document should come first.

What should you check on a WSIB clearance?

The WSIB describes a clearance as a unique number issued to registered businesses that shows a business, contractor or subcontractor is registered and up to date with the WSIB, including keeping current with premium payment and reporting. The WSIB says a clearance number is valid for up to 90 days, so the date on the clearance matters as much as the number itself. A clearance that expired last month does not tell you anything about this month.

When you receive one, check that the business name matches the name on the contract and on the insurance certificate. Check that the dates cover the days the contractor will be on site. If the project will run for several months, put the expiry date in your calendar and ask for a fresh clearance before the old one lapses. The WSIB publishes how clearances work on its website, and you can confirm a clearance there instead of relying only on a copy sent by the contractor. The Workplace Safety and Insurance Act places obligations on businesses that retain contractors in some situations, which is one reason requesting a clearance is standard practice. Have the corporation's lawyer confirm what applies to your arrangement. Our guide to hiring a condo restoration contractor covers where the clearance fits into the wider vetting process.

Subcontractors are a common gap. If the main contractor plans to use trades such as electricians, plumbers or specialty coating crews, ask for a list of them and ask how the contractor confirms their clearance and insurance. Some corporations ask for the same documents from every company that will work on site.

What insurance documents should the file include?

The standard document is a certificate of insurance showing commercial general liability coverage. The certificate is a summary issued by the contractor's broker, so it is worth reading carefully. These are the points that matter in practice:

  • Named insured. It should match the contractor's legal name on the contract.
  • Policy period. The policy must be in force for the whole project. Note the expiry date and request a renewal certificate in time.
  • Limits. The amount of coverage should be acceptable to the corporation's insurer. This guide does not set a number. Ask your own insurance broker and lawyer what the corporation requires, and put it in the contractor rules.
  • Additional insured. Many corporations require to be named as an additional insured, along with the management company where applicable. Check the exact names, because small differences can matter when a claim is made.
  • Description of operations. The description should fit the type of work. A certificate that describes unrelated work is worth querying.
  • Cancellation and change notice. Ask how the corporation will learn if the policy is cancelled during the project.

Some projects raise other coverage questions, such as vehicle use on the property, equipment, pollution exposure for abatement work or professional liability for design-build work. Raise them with your broker early. The corporation's own policy and its deductible rules also matter in claims, and our guide to condo water damage insurance in Ontario explains how those interact with a restoration project.

Which licences and trade credentials apply?

Some trades are regulated in Ontario, and the person or company doing that work needs the right authorization. Electrical contracting is one example, and the Electrical Safety Authority explains how to confirm that a contractor is licensed. Other regulated work, such as fuel gas, elevating devices and some mechanical systems, falls under other authorities. Ask the contractor which of its trades are regulated on this job, and ask for the licence or registration for each. Then verify it with the issuing body when you can.

Not every trade has a licence, so absence of a licence is not always a red flag. The point is to ask the question, record the answer and make sure regulated work is not being done by someone without authorization. For a renovation inside a suite, the corporation's alteration agreement often sets the same requirements for the owner's contractor, and our guide to the condo suite renovation approval process lists the paperwork owners usually submit. Our condo suite renovation page also covers how those requirements apply to work inside units.

What safety documents should you ask for?

Construction safety in Ontario is governed by the Occupational Health and Safety Act and its regulation for construction projects. A property manager is not expected to write a safety plan, but should be able to see that the contractor has one. Ask for a site-specific plan or written safety procedures that cover the work in this building, plus evidence that workers and supervisors have the training required for their roles.

A plan that is specific is more useful than a generic binder. Look for how the contractor will handle access routes, protection of shared areas, work at heights, fire watch and hot work if relevant, dust and noise control, waste removal, hazardous materials and how residents will be kept away from work zones. Who counts as the constructor on a given project, and what the corporation's role is, are legal questions. Ask the corporation's lawyer or a qualified health and safety adviser. This guide does not decide them.

Why ask for references and similar project experience?

References tell you what a certificate cannot: whether the contractor shows up, communicates, keeps the site clean and finishes what it starts. Ask for recent projects of similar size in occupied condominium buildings, and speak with at least two of them. Useful questions include whether the schedule held, how changes were handled, how residents were treated and whether the closing paperwork was complete. If the contractor cannot offer a relevant reference, that is worth noting before award. Our condo restoration overview describes how the stages of a project usually run, which gives you a baseline for those conversations.

What should the schedule and access plan cover?

The work schedule and access plan turn the contract into daily reality for residents and staff. It should state the work hours that fit the building rules, which areas will be affected and when, how workers and materials will use elevators and loading areas, where parking and staging will be, and how keys, fobs or visitor passes are controlled. Ask also how residents will be told: notices, timing and a named person to call with questions.

Include the corporation's own rules in the package. Many buildings restrict hours, require elevator padding or deposits, and limit noisy work. If these rules are written down and attached to the contract, there is less room for misunderstandings later. Our step-by-step condo restoration guide shows where scheduling and resident notice fit in the project sequence.

Which emergency contacts and building information should be exchanged?

Contacts flow in both directions. From the contractor, collect a project lead, a site supervisor, an after-hours number and a backup. From the building, give the contractor the manager's after-hours number, security or concierge contact, and the locations of water shut-offs, electrical rooms and fire panels. Agree on who can authorize urgent work and what happens when the manager cannot be reached. If your building has a vendor for emergencies such as floods, the onboarding file should already include them. Our guide on what to do after a condo flood shows why having those names on file before a loss saves hours.

How do you keep the file organized and current?

An onboarding file loses value when it is allowed to go stale. A few habits keep it useful:

  • Use one checklist per contractor. Record which documents were received, the date, who reviewed them and any exceptions.
  • Track expiry dates. Add the WSIB clearance, insurance renewal and licence expiry to a shared calendar with a reminder two to three weeks ahead.
  • Store the originals with the contract. Keep documents where the manager, the board and the insurer can find them, with access limited to those who need it.
  • Collect again when the scope changes. A change in work, a new subcontractor or an extended schedule may need updated documents.
  • Close the file. At the end of the project, keep the final paperwork, warranties and records together so they are available if a question arises years later.

Treat missing paperwork as information. A contractor who resists providing a certificate, delays a clearance or cannot answer basic safety questions is telling you how the project is likely to go. Equally, a contractor who offers a complete package before you ask makes your job easier. If you would like to see what a complete package looks like for your building, contact us and we will provide certificates and documentation on request, as our property manager process describes.

There is no single most important one, because each answers a different question. The WSIB clearance and the liability insurance certificate are usually collected first, since they protect the corporation and are easy to verify and track by expiry date.

The WSIB says a clearance number is valid for up to 90 days, so on a longer project the manager should request a new one before the old one lapses. Put the expiry date in a calendar when the first clearance arrives.

Many condominium corporations require it, and some also name the management company. The exact wording and limits should come from the corporation's insurance broker and lawyer, and be written into the contractor rules or the contract.

The documents are the same, but the depth of review can match the risk. A short repair still warrants a clearance and an insurance certificate. A larger program usually adds a safety plan, a schedule, an access plan and references.

The property manager or board collects the evidence, and the contractor is responsible for being properly authorized. Where a regulator publishes a way to check a licence, such as the Electrical Safety Authority for electrical contractors, use it. Ask the corporation's lawyer if you are unsure what applies.

Sources and further reading

About this guide. Written by the CondoWorks project team from our work on condominium restoration in Toronto and the GTA, and checked against the sources above. It is general information, not legal, engineering, medical or insurance advice. Laws and policies change, so confirm details for your building with the right professional. Questions or corrections: contact us.

Ready to scope your condo restoration?

Send us the building address and a short description. We will arrange a site assessment and return a written scope, timeline and price.

Free AssessmentCondo restoration, Toronto & GTA
Call Now